Beginning of the construction of the hidden house
The building develops in a descending way, becoming practically imperceptible from the street. The foundation slab was completed at the beginning of November, followed by the construction of the reinforced concrete walls of the basement. The construction of the first-floor slab was completed at the end of November, with the relationship between the threshold level and the level of the public access road to the house being visible, approximately 3 meters above. The construction of the pillars to support the roof slab began...